This 2021 office project involved a vertical extension using a hybrid steel-and-timber structure on a steel-framed building with masonry elements. Minimal foundation strengthening was needed, thanks to the use of lightweight materials and the removal of existing heavy screed finishes.
The project combines Portland stone and red brick in its primary structural addition, preserving the building’s embodied carbon while expanding usable office space.